BCN Industry Tracker

BCN POTS & Copper Retirement Tracker

Carrier copper and POTS retirement by state, county and wire center: FCC filings, deadlines and the business systems affected. Select a state to drill in.

Talk to BCN Call 1.888.866.7266

Data updated

Current, next update November 24, 2026

24

States with confirmed FCC filings

274K+

Customer locations covered by confirmed filings

49

States and territories with an active carrier footprint

190

Days to the next authorized shut-off (Jun 1, 2027)

Utah

Davis County

Not named in any filing

No FCC discontinuance filing loaded here names a wire center in Davis County. It sits inside the CenturyLink (Lumen) / AT&T footprint (Application pending at the FCC), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.

Life-safety lines on copper here

Fire alarm panels, elevator phones and alarm transmitters must keep a compliant path after copper is discontinued. BCN POTS Over LTE is permitted under NFPA 72, UL Listed, approved for fire/life-safety incl. elevators & alarm panels, HIPAA, PCI and FCC compliant.

Talk to BCN about Davis County

Status by county

1 counties in Utah have at least one wire center named in a filing. Select a county to see its wire centers.

Copper retirement status for each county in Utah with a named wire center.
County Status Carrier Places named Earliest shut-off Docket
Washington Filed CenturyLink (Lumen) 1 On or after Apr 20, 2026 WC Docket 26-55

Not named in any filing loaded here: Beaver, Box Elder, Cache, Carbon, Daggett, Davis, Duchesne, Emery, Garfield, Grand, Iron, Juab, Kane, Millard, Morgan, Piute, Rich, Salt Lake, San Juan, Sanpete, Sevier, Summit, Tooele, Uintah, Utah, Wasatch, Wayne, Weber.

Key national deadlines

  1. Done

    FCC cuts the required copper-retirement customer notice period from 180 days to 90 days.

  2. Done

    Lumen stops accepting new & move/add/change POTS orders across its 14-state legacy CenturyLink/Qwest territory.

  3. Done

    AT&T stops accepting new copper POTS orders across ~20 states in its ILEC footprint.

  4. Done

    AT&T files FCC discontinuance application covering ~90,000 customers across 18 states.

  5. Done

    FCC grants AT&T's 18-state application, over 30% of its copper footprint outside California.

  6. Done

    FCC adopts the Network and Services Modernization Order (FCC-26-19A1), streamlining Section 214 nationwide.

  7. Done

    AT&T begins physically decommissioning ~500 wire centers (~10% of its footprint).

  8. Done

    FCC approves AT&T's California discontinuance application covering 184,000+ locations.

  9. Done

    Deadline: permanent copper discontinuance for ~90,000 AT&T customers across 18 states.

  10. Upcoming

    Earliest date AT&T can begin discontinuing California copper service (184,000 locations).

  11. Upcoming

    AT&T's target to retire the large majority of its copper footprint outside California.

If your lines are in a named wire center

Move fire alarm, elevator and voice lines off copper before the carrier does it for you.

BCN POTS Over LTE keeps legacy panels working over a managed LTE connection with battery backup, on a single invoice for every location. BCN also offers Cloud Voice (UCaaS), SIP/SIP PRI and Cable Voice where a full voice migration makes more sense.

Talk to BCN bcntele.com

BCN POTS Over LTE

  • Fully monitored and managed
  • MFVN-compliant ATA, up to 8 lines per device
  • Dual-SIM 4G LTE with optional wired redundancy
  • 8-hour battery backup (24-hour optional)
  • Supports fax (T.38), modem, alarm transmitters, elevator phones
  • White-glove installation with post-install test report
  • Permitted under NFPA 72
  • UL Listed
  • Approved for fire/life-safety incl. elevators & alarm panels
  • HIPAA, PCI and FCC compliant

Source: BCN POTS Over LTE Solution Overview; BCN POTS Replacement Solutions Overview

Latest coverage from carriers and the FCC

Authoritative sources

Use these sources to discover and verify retirement records. A published deadline should be tied to the underlying carrier/FCC/state notice, not this source list alone.