BCN POTS & Copper Retirement Tracker
Carrier copper and POTS retirement by state, county and wire center: FCC filings, deadlines and the business systems affected. Select a state to drill in.
Data updated
Current, next update November 23, 2026
24
States with confirmed FCC filings
274K+
Customer locations covered by confirmed filings
49
States and territories with an active carrier footprint
191
Days to the next authorized shut-off (Jun 1, 2027)
United States Tennessee Carter County
Skip the map and go to the county table
- FCC approved
- Filed
- Not named in any filing
Select a county for its wire centers and shut-off date. On a small screen the county table below is easier to use than the map.
Tennessee
Confirmed: FCC approved
Shut-off authorized 363 days ago
- Carrier
- AT&T / CenturyLink Communications (Lumen)
- Docket
- WC Dockets 25-228, 25-259, 25-335, 26-106, 26-162, 26-192, 26-200, 26-210, 26-276, 26-293
- Earliest shut-off
- On or after Nov 24, 2025
- Not yet placed in a county
- 5
- Status
- Part of AT&T's 21-state legacy ILEC territory. AT&T stopped accepting new copper POTS orders here Oct 15, 2025 and is rolling out wire-center-level Section 214 filings under the FCC's streamlined process; targeting retirement of the "large majority" of its copper outside California by end of 2029.
Counties named in filings: 41 of 95, 72 wire centers
Select a county on the map, or in the county table below, to see its wire centers. Grey counties are not named in any FCC discontinuance filing loaded here.
Not yet placed in a county (5)
Named in a filing, but no public place record puts them in one county yet. A person places them; until then they apply somewhere in this state.
- Adams Cedar H (ACHLTNMT, WC 25-228)
- Cunningham (CNHMTNMA, WC 25-228)
- Fredonia (FRDNTNMA, WC 25-228)
- Halls (HLLSTNMT, WC 25-335)
- Lake City (LKCYTNMA, WC 25-335)
Filed, list not loaded yet: AT&T WC 26-210. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Filed, list not loaded yet: AT&T WC 26-276. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Filed, list not loaded yet: AT&T WC 26-293. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Also filed: Verizon (Frontier) WC 26-116, legacy voice throughout its former Frontier service areas, on or after Sep 8, 2026; the filing names no counties.
Anderson County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Clinton FCC approved
Bedford County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Wartrace FCC approved
Benton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Benton County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Bledsoe County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Bledsoe County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Blount County
Filed
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 26-162
- Earliest shut-off
- On or after Sep 12, 2026
- Carrier
- AT&T
Places named: 1
- Maryville Filed
Bradley County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-259
- Earliest shut-off
- On or after Nov 24, 2025
- Carrier
- CenturyLink Communications (Lumen)
Places named: 1
- Cleveland FCC approved
Campbell County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Campbell County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Cannon County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Cannon County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Carroll County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Huntingdon FCC approved
- Mckenzie FCC approved
Carter County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Carter County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Cheatham County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Cheatham County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Chester County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Chester County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Claiborne County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Claiborne County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Clay County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Clay County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Cocke County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Cocke County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Coffee County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Manchester FCC approved
Crockett County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Bells FCC approved
Cumberland County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Cumberland County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Davidson County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 26-106
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Airport Authority FCC approved
- Cockrill Bend FCC approved
DeKalb County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in DeKalb County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Decatur County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Decatur County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Dickson County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Charlotte FCC approved
- White Bluff FCC approved
Dyer County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Dyersburg FCC approved
- Newbern FCC approved
Fayette County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Moscow FCC approved
Fentress County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Fentress County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Franklin County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Franklin County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Gibson County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 6
- Dyer FCC approved
- Gibson FCC approved
- Kenton FCC approved
- Medina FCC approved
- Milan FCC approved
- Trenton FCC approved
Giles County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Giles County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Grainger County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Grainger County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Greene County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Greene County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Grundy County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Grundy County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hamblen County
Filed
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 26-162
- Earliest shut-off
- On or after Sep 12, 2026
- Carrier
- AT&T
Places named: 1
- Morristown Filed
Hamilton County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-259
- Earliest shut-off
- On or after Nov 24, 2025
- Carrier
- CenturyLink Communications (Lumen)
Places named: 2
- Chattanooga FCC approved
- East Ridge FCC approved
Hancock County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Hancock County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hardeman County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-200
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Bolivar FCC approved
- Grand Junction FCC approved
- Middleton FCC approved
- Whiteville FCC approved
Hardin County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Hardin County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hawkins County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Bulls Gap FCC approved
- Surgoinsville FCC approved
Haywood County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Brownsville FCC approved
Henderson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Henderson County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Henry County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Paris FCC approved
Hickman County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Hickman County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Houston County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Houston County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Humphreys County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Mcewen FCC approved
- Waverly FCC approved
Jackson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Jackson County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Jefferson County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- White Pine FCC approved
Johnson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Johnson County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Knox County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Knox County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lake County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Ridgely FCC approved
- Tiptonville FCC approved
Lauderdale County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Henning FCC approved
Lawrence County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Summertown FCC approved
Lewis County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Lewis County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lincoln County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Blanche FCC approved
- Fayetteville FCC approved
- Flintville FCC approved
Loudon County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Loudon County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Macon County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Macon County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Madison County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Madison County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Marion County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Jasper FCC approved
- South Pittsburg FCC approved
- Whitwell FCC approved
Marshall County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Petersburg FCC approved
Maury County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Culleoka FCC approved
- Mt Pleasant FCC approved
- Santa Fe FCC approved
- Williamsport FCC approved
McMinn County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in McMinn County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
McNairy County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Bethel Springs FCC approved
- Selmer FCC approved
Meigs County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Decatur FCC approved
Monroe County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Monroe County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Montgomery County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Palmyra FCC approved
Moore County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Moore County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Morgan County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Morgan County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Obion County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Hornbeak FCC approved
- Troy FCC approved
- Union City FCC approved
Overton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Overton County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Perry County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Perry County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Pickett County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Pickett County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Polk County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Polk County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Putnam County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Putnam County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Rhea County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Rhea County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Roane County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Harriman FCC approved
- Rockwood FCC approved
Robertson County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Cross Plains FCC approved
Rutherford County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-335, 26-200
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Eagleville FCC approved
Scott County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Scott County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Sequatchie County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Sequatchie County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Sevier County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Sevier County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Shelby County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-192
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Collierville Filed
- Humphreys FCC approved
- Southwind FCC approved
Smith County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Carthage FCC approved
Stewart County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Cumberland City FCC approved
- Dover FCC approved
Sullivan County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Sullivan County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Sumner County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Sumner County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Tipton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Tipton County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Trousdale County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Hartsville FCC approved
Unicoi County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Unicoi County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Union County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Union County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Van Buren County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Van Buren County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Warren County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Warren County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Washington County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Washington County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Wayne County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Wayne County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Weakley County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Gleason FCC approved
- Greenfield FCC approved
White County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in White County. It sits inside the AT&T / CenturyLink Communications (Lumen) footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Williamson County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Triune FCC approved
Wilson County
FCC approved
Shut-off authorized 363 days ago
- Filing / docket
- WC Dockets 25-228, 26-106
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Watertown FCC approved
Life-safety lines on copper here
Fire alarm panels, elevator phones and alarm transmitters must keep a compliant path after copper is discontinued. BCN POTS Over LTE is permitted under NFPA 72, UL Listed, approved for fire/life-safety incl. elevators & alarm panels, HIPAA, PCI and FCC compliant.
Status by county
41 counties in Tennessee have at least one wire center named in a filing. Select a county to see its wire centers.
| County | Status | Carrier | Places named | Earliest shut-off | Docket |
|---|---|---|---|---|---|
| Anderson | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Bedford | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Blount | Filed | AT&T | 1 | On or after Sep 12, 2026 | WC Docket 26-162 |
| Bradley | FCC approved | CenturyLink Communications (Lumen) | 1 | On or after Nov 24, 2025 | WC Docket 25-259 |
| Carroll | FCC approved | AT&T | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Coffee | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Crockett | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Davidson | FCC approved | AT&T | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 26-106 |
| Dickson | FCC approved | AT&T | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Dyer | FCC approved | AT&T | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Fayette | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Gibson | FCC approved | AT&T | 6 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Hamblen | Filed | AT&T | 1 | On or after Sep 12, 2026 | WC Docket 26-162 |
| Hamilton | FCC approved | CenturyLink Communications (Lumen) | 2 | On or after Nov 24, 2025 | WC Docket 25-259 |
| Hardeman | FCC approved | AT&T | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-200 |
| Hawkins | FCC approved | AT&T | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Haywood | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Henry | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Humphreys | FCC approved | AT&T | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Jefferson | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Lake | FCC approved | AT&T | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Lauderdale | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Lawrence | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Lincoln | FCC approved | AT&T | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Marion | FCC approved | AT&T | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Marshall | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Maury | FCC approved | AT&T | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| McNairy | FCC approved | AT&T | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Meigs | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Montgomery | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Obion | FCC approved | AT&T | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Roane | FCC approved | AT&T | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Robertson | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Rutherford | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Dockets 25-335, 26-200 |
| Shelby | FCC approved | AT&T | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-192 |
| Smith | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Stewart | FCC approved | AT&T | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Trousdale | FCC approved | AT&T | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Weakley | FCC approved | AT&T | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Williamson | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Wilson | FCC approved | AT&T | 1 | On or after Jun 30, 2026 | WC Dockets 25-228, 26-106 |
Not named in any filing loaded here: Benton, Bledsoe, Campbell, Cannon, Carter, Cheatham, Chester, Claiborne, Clay, Cocke, Cumberland, DeKalb, Decatur, Fentress, Franklin, Giles, Grainger, Greene, Grundy, Hancock, Hardin, Henderson, Hickman, Houston, Jackson, Johnson, Knox, Lewis, Loudon, Macon, Madison, McMinn, Monroe, Moore, Morgan, Overton, Perry, Pickett, Polk, Putnam, Rhea, Scott, Sequatchie, Sevier, Sullivan, Sumner, Tipton, Unicoi, Union, Van Buren, Warren, Washington, Wayne, White.
Key national deadlines
-
Done
FCC cuts the required copper-retirement customer notice period from 180 days to 90 days.
-
Done
Lumen stops accepting new & move/add/change POTS orders across its 14-state legacy CenturyLink/Qwest territory.
-
Done
AT&T stops accepting new copper POTS orders across ~20 states in its ILEC footprint.
-
Done
AT&T files FCC discontinuance application covering ~90,000 customers across 18 states.
-
Done
FCC grants AT&T's 18-state application, over 30% of its copper footprint outside California.
-
Done
FCC adopts the Network and Services Modernization Order (FCC-26-19A1), streamlining Section 214 nationwide.
-
Done
AT&T begins physically decommissioning ~500 wire centers (~10% of its footprint).
-
Done
FCC approves AT&T's California discontinuance application covering 184,000+ locations.
-
Done
Deadline: permanent copper discontinuance for ~90,000 AT&T customers across 18 states.
-
Upcoming
Earliest date AT&T can begin discontinuing California copper service (184,000 locations).
-
Upcoming
AT&T's target to retire the large majority of its copper footprint outside California.
If your lines are in a named wire center
Move fire alarm, elevator and voice lines off copper before the carrier does it for you.
BCN POTS Over LTE keeps legacy panels working over a managed LTE connection with battery backup, on a single invoice for every location. BCN also offers Cloud Voice (UCaaS), SIP/SIP PRI and Cable Voice where a full voice migration makes more sense.
BCN POTS Over LTE
- Fully monitored and managed
- MFVN-compliant ATA, up to 8 lines per device
- Dual-SIM 4G LTE with optional wired redundancy
- 8-hour battery backup (24-hour optional)
- Supports fax (T.38), modem, alarm transmitters, elevator phones
- White-glove installation with post-install test report
- Permitted under NFPA 72
- UL Listed
- Approved for fire/life-safety incl. elevators & alarm panels
- HIPAA, PCI and FCC compliant
Source: BCN POTS Over LTE Solution Overview; BCN POTS Replacement Solutions Overview
Latest coverage from carriers and the FCC
-
Data Center Dynamics
Nvidia looks to tap Brightspeed central offices for inference network - report
-
Data Center Dynamics
AT&T copper retirement pushes on as carrier reveals just 1% still using legacy technology
-
Light Reading
AT&T copper network retirement set to accelerate as legacy base shrinks to 1%
-
Broadband Breakfast
-
DataRemote
-
Fusion Connect
FCC Unanimously Clears a Faster Path to Retire Copper Networks
-
Broadband Breakfast
-
FCC
Network and Services Modernization Order (FCC 26-19), full text
-
Broadband Breakfast
AT&T Approved to Discontinue Service at More Than 30% of Copper Footprint This Year
-
Light Reading
-
Fierce Network
Authoritative sources
Use these sources to discover and verify retirement records. A published deadline should be tied to the underlying carrier/FCC/state notice, not this source list alone.
-
FCC
FCC Electronic Comment Filing System (ECFS)
Search carrier filings and proceedings involving copper retirement and network changes
1 - Primary
Weekly
-
FCC
FCC Wireline Competition Bureau
Monitor wireline public notices, orders, and policy updates
1 - Primary
Weekly
-
FCC
Confirm governing network-change and copper-retirement notification rules, especially §51.333
1 - Primary
Quarterly
-
Verizon
Verizon Network Disclosures 2025-2026
Find current copper-retirement disclosures by state and notice
1 - Primary
Weekly
-
Verizon
Verizon Partner Solutions Network Events
Monitor copper retirements, switch retirements, and other network events
1 - Primary
Weekly
-
Verizon
Verizon Network Disclosures 2022-2024 Archive
Research historical copper-retirement notices
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink/Lumen Network Disclosures
Find current copper-retirement notices, wire centers, CLLIs, issue dates, and effective dates
1 - Primary
Weekly
-
Lumen / CenturyLink / Qwest
CenturyLink Active Network Disclosure Archive
Research historical network disclosures
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink Wholesale Network Disclosures
Research older wholesale and FCC network-change notices
2 - Supporting
Monthly
-
Frontier
Frontier Copper Optimization / Copper Retirement Notices
Find centralized copper-retirement notices by market or state
1 - Primary
Weekly
-
Frontier
Monitor current copper and switch-retirement notices
1 - Primary
Weekly
-
Frontier
Research prior-year copper and switch-retirement notices
2 - Supporting
As needed
-
AT&T
AT&T Regulatory Documents / Tariffs
Find state-specific tariffs, service withdrawals, and wire-center records
1 - Primary
Weekly
-
AT&T
FCC ECFS Search for AT&T Filings
Verify AT&T network-change and copper-retirement filings
1 - Primary
Weekly
-
State Commissions
NARUC State Regulatory Commission Directory
Locate the applicable PUC, PSC, or BPU for state-level verification
1 - Primary
Monthly
-
Windstream / Kinetic
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Consolidated / Fidium
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Other / Smaller ILECs
NARUC State Regulatory Commission Directory
Find the appropriate state regulator for carriers without a centralized disclosure page
1 - Primary
Monthly
-
All Carriers
Direct Carrier / Wholesale Partner Notices
Capture circuit- or location-specific deadlines received directly from a carrier
1 - Primary
As received
Talk to BCN about POTS replacement
About: Carter County, TN (0 wire centers). BCN will confirm whether your service addresses fall inside an affected wire center.
Call BCN: 1.888.866.7266