BCN Industry Tracker
BCN POTS & Copper Retirement Tracker
Carrier copper and POTS retirement by state, county and wire center: FCC filings, deadlines and the business systems affected. Select a state to drill in.
Data updated
Current, next update November 24, 2026
24
States with confirmed FCC filings
274K+
Customer locations covered by confirmed filings
49
States and territories with an active carrier footprint
190
Days to the next authorized shut-off (Jun 1, 2027)
United States South Carolina Chesterfield County
Skip the map and go to the county table
- FCC approved
- Filed
- Not named in any filing
Select a county for its wire centers and shut-off date. On a small screen the county table below is easier to use than the map.
South Carolina
Confirmed: FCC approved
Shut-off authorized 146 days ago
- Carrier
- AT&T
- Docket
- WC Dockets 25-228, 25-335, 26-98, 26-106, 26-143, 26-162, 26-192, 26-200, 26-210, 26-293
- Earliest shut-off
- On or after Jun 30, 2026
- Not yet placed in a county
- 4
- Status
- Part of AT&T's 21-state legacy ILEC territory. AT&T stopped accepting new copper POTS orders here Oct 15, 2025 and is rolling out wire-center-level Section 214 filings under the FCC's streamlined process; targeting retirement of the "large majority" of its copper outside California by end of 2029.
Counties named in filings: 24 of 46, 42 wire centers
Select a county on the map, or in the county table below, to see its wire centers. Grey counties are not named in any FCC discontinuance filing loaded here.
Not yet placed in a county (4)
Named in a filing, but no public place record puts them in one county yet. A person places them; until then they apply somewhere in this state.
- Beckman Road (CLMASCBQ, WC 25-335)
- Bennetsville (BEVLSCMA, WC 25-335)
- Parklane (CLMASCPA, WC 25-335)
- Tokeena (TKNASCST, WC 25-335)
Filed, list not loaded yet: AT&T WC 26-210. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Filed, list not loaded yet: AT&T WC 26-293. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Also filed: Verizon (Frontier) WC 26-227, legacy voice throughout its service area where a replacement is available, on or after Oct 23, 2026; the filing names no counties.
Abbeville County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Abbeville Hwy FCC approved
Aiken County
Filed
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 26-98, 26-192
- Earliest shut-off
- On or after Jul 14, 2026
- Carrier
- AT&T
Places named: 1
- Aiken Filed
Allendale County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Allendale County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Anderson County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Belton FCC approved
- Honea Path FCC approved
Bamberg County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-200
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Bamberg FCC approved
- Denmark FCC approved
Barnwell County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Barnwell FCC approved
- Blackville FCC approved
Beaufort County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Beaufort County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Berkeley County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Berkeley County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Calhoun County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Calhoun County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Charleston County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-335, 26-143
- Earliest shut-off
- On or after Aug 11, 2026
- Carrier
- AT&T
Places named: 2
- Deer Park Filed
- Folly Beach FCC approved
Cherokee County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Blacksburg FCC approved
Chester County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Chester County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Chesterfield County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Chesterfield County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Clarendon County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Clarendon County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Colleton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Colleton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Darlington County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-200
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Darlington FCC approved
- Hartsville FCC approved
- Society Hill FCC approved
Dillon County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Dillon FCC approved
- Lake View FCC approved
- Latta FCC approved
Dorchester County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-335, 26-98
- Earliest shut-off
- On or after Jul 14, 2026
- Carrier
- AT&T
Places named: 2
- St. George FCC approved
- Summerville Filed
Edgefield County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Edgefield County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Fairfield County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Fairfield County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Florence County
Filed
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 26-98, 26-162
- Earliest shut-off
- On or after Jul 14, 2026
- Carrier
- AT&T
Places named: 1
- Florence Filed
Georgetown County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Georgetown County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Greenville County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Greenville County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Greenwood County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Greenwood County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hampton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Hampton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Horry County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Horry County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Jasper County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Jasper County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Kershaw County
Filed
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 26-192
- Earliest shut-off
- On or after Oct 16, 2026
- Carrier
- AT&T
Places named: 1
- Carden-lugoff Filed
Lancaster County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Lancaster County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Laurens County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-200
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Clinton FCC approved
- Joanna FCC approved
Lee County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Lee County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lexington County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Airport FCC approved
Marion County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-200
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Brittons Neck FCC approved
- Mullins FCC approved
Marlboro County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-106
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Blenheim FCC approved
- Clio FCC approved
- Mccoll FCC approved
McCormick County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in McCormick County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Newberry County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Whitmire FCC approved
Oconee County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Walhalla FCC approved
Orangeburg County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Springfield FCC approved
Pickens County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Central FCC approved
- Liberty FCC approved
Richland County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-335, 26-192
- Earliest shut-off
- On or after Oct 16, 2026
- Carrier
- AT&T
Places named: 2
- Eastover FCC approved
- Senate Street Filed
Saluda County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Saluda County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Spartanburg County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Cowpens FCC approved
- Fingerville FCC approved
- Pacolet FCC approved
- University Way FCC approved
Sumter County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Sumter County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Union County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Jonesville FCC approved
Williamsburg County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Williamsburg County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
York County
FCC approved
Shut-off authorized 146 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Hickory Grove FCC approved
Life-safety lines on copper here
Fire alarm panels, elevator phones and alarm transmitters must keep a compliant path after copper is discontinued. BCN POTS Over LTE is permitted under NFPA 72, UL Listed, approved for fire/life-safety incl. elevators & alarm panels, HIPAA, PCI and FCC compliant.
Status by county
24 counties in South Carolina have at least one wire center named in a filing. Select a county to see its wire centers.
| County | Status | Places named | Earliest shut-off | Docket |
|---|---|---|---|---|
| Abbeville | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Aiken | Filed | 1 | On or after Jul 14, 2026 | WC Dockets 26-98, 26-192 |
| Anderson | FCC approved | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Bamberg | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-200 |
| Barnwell | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Charleston | FCC approved | 2 | On or after Aug 11, 2026 | WC Dockets 25-335, 26-143 |
| Cherokee | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Darlington | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-200 |
| Dillon | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Dorchester | FCC approved | 2 | On or after Jul 14, 2026 | WC Dockets 25-335, 26-98 |
| Florence | Filed | 1 | On or after Jul 14, 2026 | WC Dockets 26-98, 26-162 |
| Kershaw | Filed | 1 | On or after Oct 16, 2026 | WC Docket 26-192 |
| Laurens | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-200 |
| Lexington | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Marion | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-200 |
| Marlboro | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-106 |
| Newberry | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Oconee | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Orangeburg | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Pickens | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Richland | FCC approved | 2 | On or after Oct 16, 2026 | WC Dockets 25-335, 26-192 |
| Spartanburg | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Union | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| York | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
Not named in any filing loaded here: Allendale, Beaufort, Berkeley, Calhoun, Chester, Chesterfield, Clarendon, Colleton, Edgefield, Fairfield, Georgetown, Greenville, Greenwood, Hampton, Horry, Jasper, Lancaster, Lee, McCormick, Saluda, Sumter, Williamsburg.
Key national deadlines
-
Done
FCC cuts the required copper-retirement customer notice period from 180 days to 90 days.
-
Done
Lumen stops accepting new & move/add/change POTS orders across its 14-state legacy CenturyLink/Qwest territory.
-
Done
AT&T stops accepting new copper POTS orders across ~20 states in its ILEC footprint.
-
Done
AT&T files FCC discontinuance application covering ~90,000 customers across 18 states.
-
Done
FCC grants AT&T's 18-state application, over 30% of its copper footprint outside California.
-
Done
FCC adopts the Network and Services Modernization Order (FCC-26-19A1), streamlining Section 214 nationwide.
-
Done
AT&T begins physically decommissioning ~500 wire centers (~10% of its footprint).
-
Done
FCC approves AT&T's California discontinuance application covering 184,000+ locations.
-
Done
Deadline: permanent copper discontinuance for ~90,000 AT&T customers across 18 states.
-
Upcoming
Earliest date AT&T can begin discontinuing California copper service (184,000 locations).
-
Upcoming
AT&T's target to retire the large majority of its copper footprint outside California.
If your lines are in a named wire center
Move fire alarm, elevator and voice lines off copper before the carrier does it for you.
BCN POTS Over LTE keeps legacy panels working over a managed LTE connection with battery backup, on a single invoice for every location. BCN also offers Cloud Voice (UCaaS), SIP/SIP PRI and Cable Voice where a full voice migration makes more sense.
BCN POTS Over LTE
- Fully monitored and managed
- MFVN-compliant ATA, up to 8 lines per device
- Dual-SIM 4G LTE with optional wired redundancy
- 8-hour battery backup (24-hour optional)
- Supports fax (T.38), modem, alarm transmitters, elevator phones
- White-glove installation with post-install test report
- Permitted under NFPA 72
- UL Listed
- Approved for fire/life-safety incl. elevators & alarm panels
- HIPAA, PCI and FCC compliant
Source: BCN POTS Over LTE Solution Overview; BCN POTS Replacement Solutions Overview
Latest coverage from carriers and the FCC
-
Data Center Dynamics
Nvidia looks to tap Brightspeed central offices for inference network - report
-
Data Center Dynamics
AT&T copper retirement pushes on as carrier reveals just 1% still using legacy technology
-
Light Reading
AT&T copper network retirement set to accelerate as legacy base shrinks to 1%
-
Broadband Breakfast
-
DataRemote
-
Fusion Connect
FCC Unanimously Clears a Faster Path to Retire Copper Networks
-
Broadband Breakfast
-
FCC
Network and Services Modernization Order (FCC 26-19), full text
-
Broadband Breakfast
AT&T Approved to Discontinue Service at More Than 30% of Copper Footprint This Year
-
Light Reading
-
Fierce Network
Authoritative sources
Use these sources to discover and verify retirement records. A published deadline should be tied to the underlying carrier/FCC/state notice, not this source list alone.
-
FCC
FCC Electronic Comment Filing System (ECFS)
Search carrier filings and proceedings involving copper retirement and network changes
1 - Primary
Weekly
-
FCC
FCC Wireline Competition Bureau
Monitor wireline public notices, orders, and policy updates
1 - Primary
Weekly
-
FCC
Confirm governing network-change and copper-retirement notification rules, especially §51.333
1 - Primary
Quarterly
-
Verizon
Verizon Network Disclosures 2025-2026
Find current copper-retirement disclosures by state and notice
1 - Primary
Weekly
-
Verizon
Verizon Partner Solutions Network Events
Monitor copper retirements, switch retirements, and other network events
1 - Primary
Weekly
-
Verizon
Verizon Network Disclosures 2022-2024 Archive
Research historical copper-retirement notices
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink/Lumen Network Disclosures
Find current copper-retirement notices, wire centers, CLLIs, issue dates, and effective dates
1 - Primary
Weekly
-
Lumen / CenturyLink / Qwest
CenturyLink Active Network Disclosure Archive
Research historical network disclosures
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink Wholesale Network Disclosures
Research older wholesale and FCC network-change notices
2 - Supporting
Monthly
-
Frontier
Frontier Copper Optimization / Copper Retirement Notices
Find centralized copper-retirement notices by market or state
1 - Primary
Weekly
-
Frontier
Monitor current copper and switch-retirement notices
1 - Primary
Weekly
-
Frontier
Research prior-year copper and switch-retirement notices
2 - Supporting
As needed
-
AT&T
AT&T Regulatory Documents / Tariffs
Find state-specific tariffs, service withdrawals, and wire-center records
1 - Primary
Weekly
-
AT&T
FCC ECFS Search for AT&T Filings
Verify AT&T network-change and copper-retirement filings
1 - Primary
Weekly
-
State Commissions
NARUC State Regulatory Commission Directory
Locate the applicable PUC, PSC, or BPU for state-level verification
1 - Primary
Monthly
-
Windstream / Kinetic
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Consolidated / Fidium
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Other / Smaller ILECs
NARUC State Regulatory Commission Directory
Find the appropriate state regulator for carriers without a centralized disclosure page
1 - Primary
Monthly
-
All Carriers
Direct Carrier / Wholesale Partner Notices
Capture circuit- or location-specific deadlines received directly from a carrier
1 - Primary
As received
Talk to BCN about POTS replacement
About: Chesterfield County, SC (0 wire centers). BCN will confirm whether your service addresses fall inside an affected wire center.
Call BCN: 1.888.866.7266