Carrier copper and POTS retirement by state, county and wire center: FCC filings, deadlines and the business systems affected. Select a state to drill in.
Data updated
Current, next update November 26, 2026
24
States with confirmed FCC filings
274K+
Customer locations covered by confirmed filings
49
States and territories with an active carrier footprint
188
Days to the next authorized shut-off (Jun 1, 2027)
United States Oklahoma Carter County
Skip the map and go to the county table
- FCC approved
- Filed
- Not named in any filing
Select a county for its wire centers and shut-off date. On a small screen the county table below is easier to use than the map.
Oklahoma
Confirmed: FCC approved
Shut-off authorized 238 days ago
- Carrier
- AT&T
- Docket
- WC Dockets 25-228, 25-335, 25-346, 26-67, 26-98, 26-143, 26-162, 26-192, 26-210, 26-224, 26-293
- Earliest shut-off
- On or after Apr 1, 2026
- Not yet placed in a county
- 6
- Status
- Part of AT&T's 21-state legacy ILEC territory. AT&T stopped accepting new copper POTS orders here Oct 15, 2025 and is rolling out wire-center-level Section 214 filings under the FCC's streamlined process; targeting retirement of the "large majority" of its copper outside California by end of 2029.
Counties named in filings: 62 of 77, 142 wire centers
Select a county on the map, or in the county table below, to see its wire centers. Grey counties are not named in any FCC discontinuance filing loaded here.
Not yet placed in a county (6)
Named in a filing, but no public place record puts them in one county yet. A person places them; until then they apply somewhere in this state.
- Marietta (MRTTOKMA, WC 25-335)
- Mulhall (MLHLOKMA, WC 25-228)
- Oklahoma City Skyline (OKCYOKSK, WC 26-162)
- Picher (PCHROKMA, WC 25-335)
- Tulsa Catoosa (TULSOKAM, WC 26-98)
- Tulsa Elgin (TULSOKTB, WC 26-162)
Filed, list not loaded yet: AT&T WC 26-210. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Filed, list not loaded yet: AT&T WC 26-224. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Filed, list not loaded yet: AT&T WC 26-293. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Adair County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Westville FCC approved
Alfalfa County
Filed
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 26-67
- Earliest shut-off
- On or after May 15, 2026
- Carrier
- AT&T
Places named: 1
- Cherokee Filed
Atoka County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Atoka FCC approved
Beaver County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Beaver County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Beckham County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Sayre FCC approved
Blaine County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Hitchcock FCC approved
Bryan County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Bennington FCC approved
- Caddo FCC approved
Caddo County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Anadarko FCC approved
- Binger FCC approved
- Cement FCC approved
- Ft Cobb FCC approved
Canadian County
Filed
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 26-192
- Earliest shut-off
- On or after Oct 16, 2026
- Carrier
- AT&T
Places named: 1
- Yukon North Filed
Carter County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Healdton FCC approved
- Wilson FCC approved
Cherokee County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Tahlequah-Cookson FCC approved
- Tahlequah-Hulbert FCC approved
Choctaw County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Boswell FCC approved
- Ft Towson FCC approved
- Hugo FCC approved
- Soper FCC approved
Cimarron County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Cimarron County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Cleveland County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Noble FCC approved
Coal County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Coalgate FCC approved
- Tupelo FCC approved
Comanche County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-335, 26-98, 26-192
- Earliest shut-off
- On or after Jul 14, 2026
- Carrier
- AT&T
Places named: 4
- Cache FCC approved
- Indiahoma FCC approved
- Lawton Main Filed
- Lawton West FCC approved
Cotton County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Walters FCC approved
Craig County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Ketchum FCC approved
- Vinita FCC approved
Creek County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Bristow FCC approved
- Depew FCC approved
- Drumright FCC approved
- Oilton FCC approved
Custer County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Clinton FCC approved
- Weatherford FCC approved
Delaware County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Grove FCC approved
Dewey County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Dewey County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Ellis County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Ellis County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Garfield County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-143
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 7
- Breckenridge FCC approved
- Carrier FCC approved
- Enid Filed
- Fairmont FCC approved
- Hillsdale FCC approved
- Kremlin FCC approved
- Waukomis FCC approved
Garvin County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Pauls Valley FCC approved
- Stratford FCC approved
- Wynnewood FCC approved
Grady County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 6
- Alex FCC approved
- Chickasha FCC approved
- Minco FCC approved
- Pocasset FCC approved
- Rush Springs FCC approved
- Tuttle FCC approved
Grant County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Medford FCC approved
Greer County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Granite FCC approved
- Mangum FCC approved
Harmon County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Harmon County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Harper County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Harper County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Haskell County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Stigler FCC approved
Hughes County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Calvin FCC approved
- Holdenville FCC approved
- Wetumka FCC approved
Jackson County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 5
- Altus FCC approved
- Blair FCC approved
- Eldorado FCC approved
- Headrick FCC approved
- Olustee FCC approved
Jefferson County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Ringling FCC approved
- Ryan FCC approved
- Waurika FCC approved
Johnston County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Tishomingo FCC approved
- Wapanucka FCC approved
Kay County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 4
- Blackwell FCC approved
- Newkirk FCC approved
- Ponca City FCC approved
- Tonkawa FCC approved
Kingfisher County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Cashion FCC approved
Kiowa County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Hobart FCC approved
- Lone Wolf FCC approved
Latimer County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Latimer County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Le Flore County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Bokoshe FCC approved
- Pocola FCC approved
- Spiro FCC approved
- Talihina FCC approved
Lincoln County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Carney FCC approved
- Chandler FCC approved
- Wellston FCC approved
Logan County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Coyle FCC approved
- Meridian FCC approved
Love County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Love County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Major County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Fairview FCC approved
Marshall County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Madill FCC approved
Mayes County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Pryor FCC approved
McClain County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Byars FCC approved
McCurtain County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-67
- Earliest shut-off
- On or after May 15, 2026
- Carrier
- AT&T
Places named: 2
- Idabel FCC approved
- Idabel-Haworth FCC approved
McIntosh County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Eufaula FCC approved
Murray County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Davis FCC approved
Muskogee County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Braggs FCC approved
Noble County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Billings FCC approved
- Perry FCC approved
- Red Rock FCC approved
Nowata County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Alluwe FCC approved
Okfuskee County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Okemah FCC approved
- Weleetka FCC approved
Oklahoma County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-143
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 5
- Arcadia FCC approved
- Harrah FCC approved
- Luther FCC approved
- Okcy Spencer FCC approved
- Oklahoma City/Wheatland Filed
Okmulgee County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-335, 26-98
- Earliest shut-off
- On or after Jul 14, 2026
- Carrier
- AT&T
Places named: 2
- Henryetta FCC approved
- Okmulgee FCC approved
Osage County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Pawhuska FCC approved
Ottawa County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Afton FCC approved
- Commerce FCC approved
- Miami FCC approved
- Quapaw FCC approved
Pawnee County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Cleveland FCC approved
- Pawnee FCC approved
- Ralston FCC approved
Payne County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Glencoe FCC approved
- Perkins FCC approved
- Ripley FCC approved
- Yale FCC approved
Pittsburg County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Hartshorne FCC approved
- Mcalester FCC approved
Pontotoc County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Roff FCC approved
Pottawatomie County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-162
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Maud FCC approved
- Shawnee FCC approved
- Wanette FCC approved
Pushmataha County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Pushmataha County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Roger Mills County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Roger Mills County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Rogers County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 26-162
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Chelsea FCC approved
- Claremore Filed
Seminole County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Cromwell FCC approved
- Konawa FCC approved
- Seminole FCC approved
- Wewoka FCC approved
Sequoyah County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Sequoyah County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Stephens County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Stephens County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Texas County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Texas County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Tillman County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Tillman County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Tulsa County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-346, 26-98
- Earliest shut-off
- On or after Apr 1, 2026
- Carrier
- AT&T
Places named: 2
- Tulsa Owasso FCC approved
- Tulsa-Sperry FCC approved
Wagoner County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Wagoner County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Washington County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Bartlesville-Federal FCC approved
- Copan FCC approved
- Dewey FCC approved
Washita County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Bessie FCC approved
- Cordell FCC approved
- Rocky FCC approved
Woods County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Alva FCC approved
Woodward County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Woodward FCC approved
Life-safety lines on copper here
Fire alarm panels, elevator phones and alarm transmitters must keep a compliant path after copper is discontinued. BCN POTS Over LTE is permitted under NFPA 72, UL Listed, approved for fire/life-safety incl. elevators & alarm panels, HIPAA, PCI and FCC compliant.
Status by county
62 counties in Oklahoma have at least one wire center named in a filing. Select a county to see its wire centers.
| County | Status | Places named | Earliest shut-off | Docket |
|---|---|---|---|---|
| Adair | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Alfalfa | Filed | 1 | On or after May 15, 2026 | WC Docket 26-67 |
| Atoka | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Beckham | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Blaine | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Bryan | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Caddo | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Canadian | Filed | 1 | On or after Oct 16, 2026 | WC Docket 26-192 |
| Carter | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Cherokee | FCC approved | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Choctaw | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Cleveland | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Coal | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Comanche | FCC approved | 4 | On or after Jul 14, 2026 | WC Dockets 25-335, 26-98, 26-192 |
| Cotton | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Craig | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Creek | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Custer | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Delaware | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Garfield | FCC approved | 7 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-143 |
| Garvin | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Grady | FCC approved | 6 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Grant | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Greer | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Haskell | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Hughes | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Jackson | FCC approved | 5 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Jefferson | FCC approved | 3 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Johnston | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Kay | FCC approved | 4 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Kingfisher | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Kiowa | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Le Flore | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Lincoln | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Logan | FCC approved | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Major | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Marshall | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Mayes | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| McClain | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| McCurtain | FCC approved | 2 | On or after May 15, 2026 | WC Dockets 25-228, 25-335, 26-67 |
| McIntosh | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Murray | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Muskogee | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Noble | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Nowata | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Okfuskee | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Oklahoma | FCC approved | 5 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-143 |
| Okmulgee | FCC approved | 2 | On or after Jul 14, 2026 | WC Dockets 25-335, 26-98 |
| Osage | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Ottawa | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Pawnee | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Payne | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Pittsburg | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Pontotoc | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Pottawatomie | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-162 |
| Rogers | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 26-162 |
| Seminole | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Tulsa | FCC approved | 2 | On or after Apr 1, 2026 | WC Dockets 25-228, 25-346, 26-98 |
| Washington | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Washita | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Woods | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Woodward | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
Not named in any filing loaded here: Beaver, Cimarron, Dewey, Ellis, Harmon, Harper, Latimer, Love, Pushmataha, Roger Mills, Sequoyah, Stephens, Texas, Tillman, Wagoner.
Key national deadlines
-
Done
FCC cuts the required copper-retirement customer notice period from 180 days to 90 days.
-
Done
Lumen stops accepting new & move/add/change POTS orders across its 14-state legacy CenturyLink/Qwest territory.
-
Done
AT&T stops accepting new copper POTS orders across ~20 states in its ILEC footprint.
-
Done
AT&T files FCC discontinuance application covering ~90,000 customers across 18 states.
-
Done
FCC grants AT&T's 18-state application, over 30% of its copper footprint outside California.
-
Done
FCC adopts the Network and Services Modernization Order (FCC-26-19A1), streamlining Section 214 nationwide.
-
Done
AT&T begins physically decommissioning ~500 wire centers (~10% of its footprint).
-
Done
FCC approves AT&T's California discontinuance application covering 184,000+ locations.
-
Done
Deadline: permanent copper discontinuance for ~90,000 AT&T customers across 18 states.
-
Upcoming
Earliest date AT&T can begin discontinuing California copper service (184,000 locations).
-
Upcoming
AT&T's target to retire the large majority of its copper footprint outside California.
If your lines are in a named wire center
Move fire alarm, elevator and voice lines off copper before the carrier does it for you.
BCN POTS Over LTE keeps legacy panels working over a managed LTE connection with battery backup, on a single invoice for every location. BCN also offers Cloud Voice (UCaaS), SIP/SIP PRI and Cable Voice where a full voice migration makes more sense.
BCN POTS Over LTE
- Fully monitored and managed
- MFVN-compliant ATA, up to 8 lines per device
- Dual-SIM 4G LTE with optional wired redundancy
- 8-hour battery backup (24-hour optional)
- Supports fax (T.38), modem, alarm transmitters, elevator phones
- White-glove installation with post-install test report
- Permitted under NFPA 72
- UL Listed
- Approved for fire/life-safety incl. elevators & alarm panels
- HIPAA, PCI and FCC compliant
Source: BCN POTS Over LTE Solution Overview; BCN POTS Replacement Solutions Overview
Latest coverage from carriers and the FCC
-
Data Center Dynamics
Nvidia looks to tap Brightspeed central offices for inference network - report
-
Data Center Dynamics
AT&T copper retirement pushes on as carrier reveals just 1% still using legacy technology
-
Light Reading
AT&T copper network retirement set to accelerate as legacy base shrinks to 1%
-
Broadband Breakfast
-
DataRemote
-
Fusion Connect
FCC Unanimously Clears a Faster Path to Retire Copper Networks
-
Broadband Breakfast
-
FCC
Network and Services Modernization Order (FCC 26-19), full text
-
Broadband Breakfast
AT&T Approved to Discontinue Service at More Than 30% of Copper Footprint This Year
-
Light Reading
-
Fierce Network
Authoritative sources
Use these sources to discover and verify retirement records. A published deadline should be tied to the underlying carrier/FCC/state notice, not this source list alone.
-
FCC
FCC Electronic Comment Filing System (ECFS)
Search carrier filings and proceedings involving copper retirement and network changes
1 - Primary
Weekly
-
FCC
FCC Wireline Competition Bureau
Monitor wireline public notices, orders, and policy updates
1 - Primary
Weekly
-
FCC
Confirm governing network-change and copper-retirement notification rules, especially §51.333
1 - Primary
Quarterly
-
Verizon
Verizon Network Disclosures 2025-2026
Find current copper-retirement disclosures by state and notice
1 - Primary
Weekly
-
Verizon
Verizon Partner Solutions Network Events
Monitor copper retirements, switch retirements, and other network events
1 - Primary
Weekly
-
Verizon
Verizon Network Disclosures 2022-2024 Archive
Research historical copper-retirement notices
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink/Lumen Network Disclosures
Find current copper-retirement notices, wire centers, CLLIs, issue dates, and effective dates
1 - Primary
Weekly
-
Lumen / CenturyLink / Qwest
CenturyLink Active Network Disclosure Archive
Research historical network disclosures
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink Wholesale Network Disclosures
Research older wholesale and FCC network-change notices
2 - Supporting
Monthly
-
Frontier
Frontier Copper Optimization / Copper Retirement Notices
Find centralized copper-retirement notices by market or state
1 - Primary
Weekly
-
Frontier
Monitor current copper and switch-retirement notices
1 - Primary
Weekly
-
Frontier
Research prior-year copper and switch-retirement notices
2 - Supporting
As needed
-
AT&T
AT&T Regulatory Documents / Tariffs
Find state-specific tariffs, service withdrawals, and wire-center records
1 - Primary
Weekly
-
AT&T
FCC ECFS Search for AT&T Filings
Verify AT&T network-change and copper-retirement filings
1 - Primary
Weekly
-
State Commissions
NARUC State Regulatory Commission Directory
Locate the applicable PUC, PSC, or BPU for state-level verification
1 - Primary
Monthly
-
Windstream / Kinetic
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Consolidated / Fidium
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Other / Smaller ILECs
NARUC State Regulatory Commission Directory
Find the appropriate state regulator for carriers without a centralized disclosure page
1 - Primary
Monthly
-
All Carriers
Direct Carrier / Wholesale Partner Notices
Capture circuit- or location-specific deadlines received directly from a carrier
1 - Primary
As received
Talk to BCN about POTS replacement
About: Carter County, OK (2 wire centers). BCN will confirm whether your service addresses fall inside an affected wire center.