24
States with confirmed FCC filings
274K+
Customer locations covered by confirmed filings
49
States and territories with an active carrier footprint
189
Days to the next authorized shut-off (Jun 1, 2027)
United States Ohio Miami County
Skip the map and go to the county table
- FCC approved
- Filed
- Not named in any filing
Select a county for its wire centers and shut-off date. On a small screen the county table below is easier to use than the map.
Ohio
Confirmed: FCC approved
Shut-off authorized 147 days ago
- Carrier
- AT&T
- Docket
- WC Dockets 25-228, 25-335, 26-98, 26-210, 26-276
- Earliest shut-off
- On or after Jun 30, 2026
- Not yet placed in a county
- 4
- Status
- Part of AT&T's 21-state legacy ILEC territory. AT&T stopped accepting new copper POTS orders here Oct 15, 2025 and is rolling out wire-center-level Section 214 filings under the FCC's streamlined process; targeting retirement of the "large majority" of its copper outside California by end of 2029.
Counties named in filings: 39 of 88, 94 wire centers
Select a county on the map, or in the county table below, to see its wire centers. Grey counties are not named in any FCC discontinuance filing loaded here.
Not yet placed in a county (4)
Named in a filing, but no public place record puts them in one county yet. A person places them; until then they apply somewhere in this state.
- Belfast (BLFSOH76, WC 25-335)
- Harrisburg (HRBGOH87, WC 25-335)
- Sedalia (SDLIOH87, WC 25-228)
- Shawnee (SHWNOH39, WC 25-335)
Filed, list not loaded yet: AT&T WC 26-210. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Filed, list not loaded yet: AT&T WC 26-276. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Also filed: Verizon (Frontier) WC 26-227, legacy voice throughout its service area where a replacement is available, on or after Oct 23, 2026; the filing names no counties.
Adams County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Manchester FCC approved
- Winchester FCC approved
Allen County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Allen County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Ashland County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Ashland County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Ashtabula County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Ashtabula County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Athens County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Athens County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Auglaize County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Auglaize County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Belmont County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Bellaire FCC approved
- Bethesda FCC approved
Brown County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Aberdeen FCC approved
- Ripley FCC approved
Butler County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Trenton FCC approved
Carroll County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Carroll County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Champaign County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Christiansburg FCC approved
Clark County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 6
- Donnelsville FCC approved
- North Hampton FCC approved
- Pitchin FCC approved
- South Charleston FCC approved
- South Vienna FCC approved
- Tremont City FCC approved
Clermont County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Clermont County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Clinton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Clinton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Columbiana County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 6
- East Palestine FCC approved
- Leetonia FCC approved
- New Waterford FCC approved
- Rogers FCC approved
- Salineville FCC approved
- Wellsville FCC approved
Coshocton County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Conesville FCC approved
- West Lafayette FCC approved
Crawford County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Crawford County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Cuyahoga County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Brook Park Aerospace FCC approved
Darke County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Darke County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Defiance County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Defiance County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Delaware County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Delaware County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Erie County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Bloomingville FCC approved
- Castalia FCC approved
Fairfield County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Carroll FCC approved
- Rushville FCC approved
- Sugar Grove FCC approved
Fayette County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Bloomingburg FCC approved
- Jeffersonville FCC approved
- Milledgeville FCC approved
- Washington Court Ho FCC approved
Franklin County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-335, 26-98
- Earliest shut-off
- On or after Jul 14, 2026
- Carrier
- AT&T
Places named: 2
- Columbus FCC approved
- New Rome Filed
Fulton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Fulton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Gallia County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Cheshire FCC approved
- Rio Grande FCC approved
- Vinton FCC approved
Geauga County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Burton Oh FCC approved
- Scotland FCC approved
Greene County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 5
- Bowersville FCC approved
- Cedarville FCC approved
- Fairborn FCC approved
- Jamestown FCC approved
- Spring Valley FCC approved
Guernsey County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Guernsey County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hamilton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Hamilton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hancock County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Hancock County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hardin County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Hardin County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Harrison County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Harrison County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Henry County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Henry County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Highland County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 4
- Hillsboro FCC approved
- Marshall FCC approved
- Rainsboro FCC approved
- Sugar Tree Ridge FCC approved
Hocking County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Murray City FCC approved
Holmes County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Holmes County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Huron County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Huron County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Jackson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Jackson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Jefferson County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Mingo Junction FCC approved
Knox County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Danville FCC approved
Lake County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Kirtland FCC approved
- Leroy FCC approved
Lawrence County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- South Point FCC approved
Licking County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Licking County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Logan County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Logan County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lorain County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Lorain County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lucas County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Whitehouse FCC approved
Madison County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- South Solon FCC approved
- West Jefferson FCC approved
Mahoning County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Lowellville FCC approved
- New Middletown FCC approved
- North Jackson FCC approved
- Sebring FCC approved
Marion County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Marion County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Medina County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Medina County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Meigs County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Meigs County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Mercer County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Mercer County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Miami County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Fletcher Lena FCC approved
- Piqua FCC approved
Monroe County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Clarington FCC approved
Montgomery County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Montgomery County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Morgan County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Morgan County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Morrow County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Morrow County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Muskingum County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Dresden FCC approved
- Fultonham FCC approved
- Norwich FCC approved
Noble County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Noble County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Ottawa County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Ottawa County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Paulding County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Paulding County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Perry County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 6
- Corning FCC approved
- Glenford FCC approved
- New Lexington FCC approved
- Roseville FCC approved
- Somerset FCC approved
- Thornville FCC approved
Pickaway County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- New Holland FCC approved
Pike County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Pike County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Portage County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Atwater FCC approved
- Mantua FCC approved
- Rootstown FCC approved
Preble County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Preble County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Putnam County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Putnam County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Richland County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Richland County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Ross County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Ross County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Sandusky County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Lindsey FCC approved
Scioto County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Scioto County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Seneca County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- New Riegel FCC approved
- Tiffin FCC approved
Shelby County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Shelby County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Stark County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 7
- Canal Fulton FCC approved
- East Canton FCC approved
- Louisville FCC approved
- Magnolia FCC approved
- Marlboro FCC approved
- Navarre FCC approved
- North Industry FCC approved
Summit County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Summit County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Trumbull County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Trumbull County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Tuscarawas County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Gnadenhutten FCC approved
- Uhrichsville FCC approved
Union County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Union County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Van Wert County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Van Wert County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Vinton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Vinton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Warren County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Five Points FCC approved
- Franklin FCC approved
Washington County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Belpre FCC approved
Wayne County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Dalton FCC approved
Williams County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Williams County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Wood County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Wood County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Wyandot County
FCC approved
Shut-off authorized 147 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Upper Sandusky FCC approved
Life-safety lines on copper here
Fire alarm panels, elevator phones and alarm transmitters must keep a compliant path after copper is discontinued. BCN POTS Over LTE is permitted under NFPA 72, UL Listed, approved for fire/life-safety incl. elevators & alarm panels, HIPAA, PCI and FCC compliant.
Status by county
39 counties in Ohio have at least one wire center named in a filing. Select a county to see its wire centers.
| County | Status | Places named | Earliest shut-off | Docket |
|---|---|---|---|---|
| Adams | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Belmont | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Brown | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Butler | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Champaign | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Clark | FCC approved | 6 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Columbiana | FCC approved | 6 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Coshocton | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Cuyahoga | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Erie | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Fairfield | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Fayette | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Franklin | FCC approved | 2 | On or after Jul 14, 2026 | WC Dockets 25-335, 26-98 |
| Gallia | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Geauga | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Greene | FCC approved | 5 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Highland | FCC approved | 4 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Hocking | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Jefferson | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Knox | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Lake | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Lawrence | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Lucas | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Madison | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Mahoning | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Miami | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Monroe | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Muskingum | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Perry | FCC approved | 6 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Pickaway | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Portage | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Sandusky | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Seneca | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Stark | FCC approved | 7 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Tuscarawas | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Warren | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Washington | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Wayne | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Wyandot | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
Not named in any filing loaded here: Allen, Ashland, Ashtabula, Athens, Auglaize, Carroll, Clermont, Clinton, Crawford, Darke, Defiance, Delaware, Fulton, Guernsey, Hamilton, Hancock, Hardin, Harrison, Henry, Holmes, Huron, Jackson, Licking, Logan, Lorain, Marion, Medina, Meigs, Mercer, Montgomery, Morgan, Morrow, Noble, Ottawa, Paulding, Pike, Preble, Putnam, Richland, Ross, Scioto, Shelby, Summit, Trumbull, Union, Van Wert, Vinton, Williams, Wood.
Key national deadlines
-
Done
FCC cuts the required copper-retirement customer notice period from 180 days to 90 days.
-
Done
Lumen stops accepting new & move/add/change POTS orders across its 14-state legacy CenturyLink/Qwest territory.
-
Done
AT&T stops accepting new copper POTS orders across ~20 states in its ILEC footprint.
-
Done
AT&T files FCC discontinuance application covering ~90,000 customers across 18 states.
-
Done
FCC grants AT&T's 18-state application, over 30% of its copper footprint outside California.
-
Done
FCC adopts the Network and Services Modernization Order (FCC-26-19A1), streamlining Section 214 nationwide.
-
Done
AT&T begins physically decommissioning ~500 wire centers (~10% of its footprint).
-
Done
FCC approves AT&T's California discontinuance application covering 184,000+ locations.
-
Done
Deadline: permanent copper discontinuance for ~90,000 AT&T customers across 18 states.
-
Upcoming
Earliest date AT&T can begin discontinuing California copper service (184,000 locations).
-
Upcoming
AT&T's target to retire the large majority of its copper footprint outside California.
If your lines are in a named wire center
Move fire alarm, elevator and voice lines off copper before the carrier does it for you.
BCN POTS Over LTE keeps legacy panels working over a managed LTE connection with battery backup, on a single invoice for every location. BCN also offers Cloud Voice (UCaaS), SIP/SIP PRI and Cable Voice where a full voice migration makes more sense.
BCN POTS Over LTE
- Fully monitored and managed
- MFVN-compliant ATA, up to 8 lines per device
- Dual-SIM 4G LTE with optional wired redundancy
- 8-hour battery backup (24-hour optional)
- Supports fax (T.38), modem, alarm transmitters, elevator phones
- White-glove installation with post-install test report
- Permitted under NFPA 72
- UL Listed
- Approved for fire/life-safety incl. elevators & alarm panels
- HIPAA, PCI and FCC compliant
Source: BCN POTS Over LTE Solution Overview; BCN POTS Replacement Solutions Overview
Latest coverage from carriers and the FCC
-
Data Center Dynamics
Nvidia looks to tap Brightspeed central offices for inference network - report
-
Data Center Dynamics
AT&T copper retirement pushes on as carrier reveals just 1% still using legacy technology
-
Light Reading
AT&T copper network retirement set to accelerate as legacy base shrinks to 1%
-
Broadband Breakfast
-
DataRemote
-
Fusion Connect
FCC Unanimously Clears a Faster Path to Retire Copper Networks
-
Broadband Breakfast
-
FCC
Network and Services Modernization Order (FCC 26-19), full text
-
Broadband Breakfast
AT&T Approved to Discontinue Service at More Than 30% of Copper Footprint This Year
-
Light Reading
-
Fierce Network
Authoritative sources
Use these sources to discover and verify retirement records. A published deadline should be tied to the underlying carrier/FCC/state notice, not this source list alone.
-
FCC
FCC Electronic Comment Filing System (ECFS)
Search carrier filings and proceedings involving copper retirement and network changes
1 - Primary
Weekly
-
FCC
FCC Wireline Competition Bureau
Monitor wireline public notices, orders, and policy updates
1 - Primary
Weekly
-
FCC
Confirm governing network-change and copper-retirement notification rules, especially §51.333
1 - Primary
Quarterly
-
Verizon
Verizon Network Disclosures 2025-2026
Find current copper-retirement disclosures by state and notice
1 - Primary
Weekly
-
Verizon
Verizon Partner Solutions Network Events
Monitor copper retirements, switch retirements, and other network events
1 - Primary
Weekly
-
Verizon
Verizon Network Disclosures 2022-2024 Archive
Research historical copper-retirement notices
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink/Lumen Network Disclosures
Find current copper-retirement notices, wire centers, CLLIs, issue dates, and effective dates
1 - Primary
Weekly
-
Lumen / CenturyLink / Qwest
CenturyLink Active Network Disclosure Archive
Research historical network disclosures
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink Wholesale Network Disclosures
Research older wholesale and FCC network-change notices
2 - Supporting
Monthly
-
Frontier
Frontier Copper Optimization / Copper Retirement Notices
Find centralized copper-retirement notices by market or state
1 - Primary
Weekly
-
Frontier
Monitor current copper and switch-retirement notices
1 - Primary
Weekly
-
Frontier
Research prior-year copper and switch-retirement notices
2 - Supporting
As needed
-
AT&T
AT&T Regulatory Documents / Tariffs
Find state-specific tariffs, service withdrawals, and wire-center records
1 - Primary
Weekly
-
AT&T
FCC ECFS Search for AT&T Filings
Verify AT&T network-change and copper-retirement filings
1 - Primary
Weekly
-
State Commissions
NARUC State Regulatory Commission Directory
Locate the applicable PUC, PSC, or BPU for state-level verification
1 - Primary
Monthly
-
Windstream / Kinetic
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Consolidated / Fidium
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Other / Smaller ILECs
NARUC State Regulatory Commission Directory
Find the appropriate state regulator for carriers without a centralized disclosure page
1 - Primary
Monthly
-
All Carriers
Direct Carrier / Wholesale Partner Notices
Capture circuit- or location-specific deadlines received directly from a carrier
1 - Primary
As received
Talk to BCN about POTS replacement
About: Miami County, OH (2 wire centers). BCN will confirm whether your service addresses fall inside an affected wire center.