BCN Industry Tracker
BCN POTS & Copper Retirement Tracker
Carrier copper and POTS retirement by state, county and wire center: FCC filings, deadlines and the business systems affected. Select a state to drill in.
Data updated
Current, next update November 25, 2026
24
States with confirmed FCC filings
274K+
Customer locations covered by confirmed filings
49
States and territories with an active carrier footprint
189
Days to the next authorized shut-off (Jun 1, 2027)
United States Kentucky Metcalfe County
Skip the map and go to the county table
- FCC approved
- Filed
- Not named in any filing
Select a county for its wire centers and shut-off date. On a small screen the county table below is easier to use than the map.
Kentucky
Confirmed: FCC approved
Shut-off authorized 266 days ago
- Carrier
- AT&T
- Docket
- WC Dockets 25-228, 25-327, 25-335, 26-106, 26-162, 26-210, 26-276
- Earliest shut-off
- On or after Mar 3, 2026
- Not yet placed in a county
- 2
- Status
- Part of AT&T's 21-state legacy ILEC territory. AT&T stopped accepting new copper POTS orders here Oct 15, 2025 and is rolling out wire-center-level Section 214 filings under the FCC's streamlined process; targeting retirement of the "large majority" of its copper outside California by end of 2029.
Counties named in filings: 44 of 120, 105 wire centers
Select a county on the map, or in the county table below, to see its wire centers. Grey counties are not named in any FCC discontinuance filing loaded here.
Not yet placed in a county (2)
Named in a filing, but no public place record puts them in one county yet. A person places them; until then they apply somewhere in this state.
- Dukedom (FLTNKYDD, WC 25-228)
- Pleasant Ridge (PLRGKYMA, WC 25-228)
Filed, list not loaded yet: AT&T WC 26-210. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Filed, list not loaded yet: AT&T WC 26-276. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Adair County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Adair County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Allen County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Allen County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Anderson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Anderson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Ballard County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Ballard County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Barren County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Barren County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Bath County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Bath County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Bell County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Bell County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Boone County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Boone County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Bourbon County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Little Rock FCC approved
- Millersburg FCC approved
- N. Middlestown FCC approved
Boyd County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Boyd County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Boyle County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Boyle County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Bracken County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Bracken County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Breathitt County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Breathitt County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Breckinridge County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Cloverport FCC approved
- Hardinsburg FCC approved
- McDaniels FCC approved
Bullitt County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Lebanon Junc. FCC approved
Butler County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Morgantown FCC approved
Caldwell County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Fredonia FCC approved
Calloway County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Calloway County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Campbell County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Campbell County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Carlisle County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Carlisle County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Carroll County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 26-106
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Carrollton FCC approved
- Ghent FCC approved
Carter County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Carter County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Casey County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Casey County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Christian County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Crofton FCC approved
- Lafayette FCC approved
- Pembroke FCC approved
Clark County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Pilot View FCC approved
Clay County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Clay County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Clinton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Clinton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Crittenden County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Marion FCC approved
Cumberland County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Cumberland County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Daviess County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 8
- Ensor FCC approved
- Habit FCC approved
- Maceo FCC approved
- Panther FCC approved
- Stanley FCC approved
- Utica FCC approved
- West Louisville FCC approved
- Whitesville FCC approved
Edmonson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Edmonson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Elliott County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Elliott County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Estill County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Estill County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Fayette County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Fayette County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Fleming County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Fleming County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Floyd County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Floyd County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Franklin County
Filed
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 26-162
- Earliest shut-off
- On or after Sep 12, 2026
- Carrier
- AT&T
Places named: 1
- Frankfort Filed
Fulton County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Cayce FCC approved
- Fulton FCC approved
- Hickman FCC approved
Gallatin County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Gallatin County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Garrard County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Garrard County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Grant County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Grant County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Graves County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Symsonia FCC approved
- Water Valley FCC approved
Grayson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Grayson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Green County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Green County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Greenup County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Greenup County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hancock County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Hawesville FCC approved
Hardin County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- West Point FCC approved
Harlan County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Harlan County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Harrison County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Harrison County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Hart County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Hart County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Henderson County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Corydon FCC approved
- Hebbardsville FCC approved
- Robards FCC approved
Henry County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 5
- Campbellsburg FCC approved
- Eminence FCC approved
- Pleasureville FCC approved
- Port Royal FCC approved
- Sulpher FCC approved
Hickman County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Clinton FCC approved
Hopkins County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 7
- Dawson Springs FCC approved
- Earlington FCC approved
- Hanson FCC approved
- Mortons Gap FCC approved
- Nebo FCC approved
- Nortonville FCC approved
- St. Charles FCC approved
Jackson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Jackson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Jefferson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Jefferson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Jessamine County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Jessamine County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Johnson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Johnson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Kenton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Kenton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Knott County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Knott County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Knox County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Knox County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Larue County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Larue County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Laurel County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Laurel County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lawrence County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Louisa FCC approved
Lee County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Lee County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Leslie County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Leslie County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Letcher County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Letcher County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lewis County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Lewis County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lincoln County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Crab Orchard FCC approved
Livingston County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Livingston County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Logan County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Russellville FCC approved
Lyon County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Lyon County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Madison County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Kirksville FCC approved
Magoffin County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Magoffin County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Marion County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Marion County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Marshall County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Aurora FCC approved
- Benton FCC approved
- Gilbertsville FCC approved
Martin County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Martin County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Mason County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Maysville FCC approved
McCracken County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Information Park FCC approved
- Lone Oak FCC approved
- Reidland FCC approved
McCreary County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in McCreary County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
McLean County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Calhoun FCC approved
- Island FCC approved
- Livermore FCC approved
- Sacramento FCC approved
Meade County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Meade County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Menifee County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Menifee County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Mercer County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Burgin FCC approved
- Cornishville FCC approved
- Salvisa FCC approved
Metcalfe County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Metcalfe County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Monroe County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Monroe County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Montgomery County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Montgomery County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Morgan County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Morgan County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Muhlenberg County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 4
- Bremen FCC approved
- Central City FCC approved
- Drakesboro FCC approved
- Greenville FCC approved
Nelson County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Bloomfield FCC approved
- Chaplin FCC approved
Nicholas County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Carlisle FCC approved
Ohio County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Beaver Dam FCC approved
- Centertown FCC approved
- Fordsville FCC approved
- Hartford FCC approved
Oldham County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Oldham County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Owen County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- New Liberty FCC approved
- Owenton FCC approved
Owsley County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Owsley County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Pendleton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Pendleton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Perry County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Perry County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Pike County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Pike County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Powell County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Powell County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Pulaski County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Pulaski County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Robertson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Robertson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Rockcastle County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Rockcastle County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Rowan County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Rowan County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Russell County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Russell County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Scott County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Stamping Ground FCC approved
Shelby County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Bagdad FCC approved
- Finchville FCC approved
- Waddy FCC approved
Simpson County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Franklin FCC approved
Spencer County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Mount Eden FCC approved
Taylor County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Taylor County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Todd County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Elkton FCC approved
- Guthrie FCC approved
- Sharon Grove FCC approved
- Trenton FCC approved
Trigg County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Cadiz FCC approved
- Canton FCC approved
Trimble County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Bedford FCC approved
- Milton FCC approved
Union County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Morganfield FCC approved
- Sturgis FCC approved
Warren County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-327
- Earliest shut-off
- On or after Mar 3, 2026
- Carrier
- AT&T
Places named: 2
- Bowling Green FCC approved
- Woodburn FCC approved
Washington County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Mackville FCC approved
- Mooresville FCC approved
- Willisburg FCC approved
Wayne County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Wayne County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Webster County
FCC approved
Shut-off authorized 266 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 5
- Clay FCC approved
- Dixon FCC approved
- Providence FCC approved
- Sebree FCC approved
- Slaughters FCC approved
Whitley County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Whitley County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Wolfe County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Wolfe County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Woodford County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Woodford County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Life-safety lines on copper here
Fire alarm panels, elevator phones and alarm transmitters must keep a compliant path after copper is discontinued. BCN POTS Over LTE is permitted under NFPA 72, UL Listed, approved for fire/life-safety incl. elevators & alarm panels, HIPAA, PCI and FCC compliant.
Status by county
44 counties in Kentucky have at least one wire center named in a filing. Select a county to see its wire centers.
| County | Status | Places named | Earliest shut-off | Docket |
|---|---|---|---|---|
| Bourbon | FCC approved | 3 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Breckinridge | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Bullitt | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Butler | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Caldwell | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Carroll | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 26-106 |
| Christian | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Clark | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Crittenden | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Daviess | FCC approved | 8 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Franklin | Filed | 1 | On or after Sep 12, 2026 | WC Docket 26-162 |
| Fulton | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Graves | FCC approved | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Hancock | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Hardin | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Henderson | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Henry | FCC approved | 5 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Hickman | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Hopkins | FCC approved | 7 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Lawrence | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Lincoln | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Logan | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Madison | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Marshall | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Mason | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| McCracken | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| McLean | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Mercer | FCC approved | 3 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Muhlenberg | FCC approved | 4 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Nelson | FCC approved | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Nicholas | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Ohio | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Owen | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Scott | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Shelby | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Simpson | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Spencer | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Todd | FCC approved | 4 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Trigg | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Trimble | FCC approved | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Union | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Warren | FCC approved | 2 | On or after Mar 3, 2026 | WC Dockets 25-228, 25-327 |
| Washington | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Webster | FCC approved | 5 | On or after Jun 30, 2026 | WC Docket 25-228 |
Not named in any filing loaded here: Adair, Allen, Anderson, Ballard, Barren, Bath, Bell, Boone, Boyd, Boyle, Bracken, Breathitt, Calloway, Campbell, Carlisle, Carter, Casey, Clay, Clinton, Cumberland, Edmonson, Elliott, Estill, Fayette, Fleming, Floyd, Gallatin, Garrard, Grant, Grayson, Green, Greenup, Harlan, Harrison, Hart, Jackson, Jefferson, Jessamine, Johnson, Kenton, Knott, Knox, Larue, Laurel, Lee, Leslie, Letcher, Lewis, Livingston, Lyon, Magoffin, Marion, Martin, McCreary, Meade, Menifee, Metcalfe, Monroe, Montgomery, Morgan, Oldham, Owsley, Pendleton, Perry, Pike, Powell, Pulaski, Robertson, Rockcastle, Rowan, Russell, Taylor, Wayne, Whitley, Wolfe, Woodford.
Key national deadlines
-
Done
FCC cuts the required copper-retirement customer notice period from 180 days to 90 days.
-
Done
Lumen stops accepting new & move/add/change POTS orders across its 14-state legacy CenturyLink/Qwest territory.
-
Done
AT&T stops accepting new copper POTS orders across ~20 states in its ILEC footprint.
-
Done
AT&T files FCC discontinuance application covering ~90,000 customers across 18 states.
-
Done
FCC grants AT&T's 18-state application, over 30% of its copper footprint outside California.
-
Done
FCC adopts the Network and Services Modernization Order (FCC-26-19A1), streamlining Section 214 nationwide.
-
Done
AT&T begins physically decommissioning ~500 wire centers (~10% of its footprint).
-
Done
FCC approves AT&T's California discontinuance application covering 184,000+ locations.
-
Done
Deadline: permanent copper discontinuance for ~90,000 AT&T customers across 18 states.
-
Upcoming
Earliest date AT&T can begin discontinuing California copper service (184,000 locations).
-
Upcoming
AT&T's target to retire the large majority of its copper footprint outside California.
If your lines are in a named wire center
Move fire alarm, elevator and voice lines off copper before the carrier does it for you.
BCN POTS Over LTE keeps legacy panels working over a managed LTE connection with battery backup, on a single invoice for every location. BCN also offers Cloud Voice (UCaaS), SIP/SIP PRI and Cable Voice where a full voice migration makes more sense.
BCN POTS Over LTE
- Fully monitored and managed
- MFVN-compliant ATA, up to 8 lines per device
- Dual-SIM 4G LTE with optional wired redundancy
- 8-hour battery backup (24-hour optional)
- Supports fax (T.38), modem, alarm transmitters, elevator phones
- White-glove installation with post-install test report
- Permitted under NFPA 72
- UL Listed
- Approved for fire/life-safety incl. elevators & alarm panels
- HIPAA, PCI and FCC compliant
Source: BCN POTS Over LTE Solution Overview; BCN POTS Replacement Solutions Overview
Latest coverage from carriers and the FCC
-
Data Center Dynamics
Nvidia looks to tap Brightspeed central offices for inference network - report
-
Data Center Dynamics
AT&T copper retirement pushes on as carrier reveals just 1% still using legacy technology
-
Light Reading
AT&T copper network retirement set to accelerate as legacy base shrinks to 1%
-
Broadband Breakfast
-
DataRemote
-
Fusion Connect
FCC Unanimously Clears a Faster Path to Retire Copper Networks
-
Broadband Breakfast
-
FCC
Network and Services Modernization Order (FCC 26-19), full text
-
Broadband Breakfast
AT&T Approved to Discontinue Service at More Than 30% of Copper Footprint This Year
-
Light Reading
-
Fierce Network
Authoritative sources
Use these sources to discover and verify retirement records. A published deadline should be tied to the underlying carrier/FCC/state notice, not this source list alone.
-
FCC
FCC Electronic Comment Filing System (ECFS)
Search carrier filings and proceedings involving copper retirement and network changes
1 - Primary
Weekly
-
FCC
FCC Wireline Competition Bureau
Monitor wireline public notices, orders, and policy updates
1 - Primary
Weekly
-
FCC
Confirm governing network-change and copper-retirement notification rules, especially §51.333
1 - Primary
Quarterly
-
Verizon
Verizon Network Disclosures 2025-2026
Find current copper-retirement disclosures by state and notice
1 - Primary
Weekly
-
Verizon
Verizon Partner Solutions Network Events
Monitor copper retirements, switch retirements, and other network events
1 - Primary
Weekly
-
Verizon
Verizon Network Disclosures 2022-2024 Archive
Research historical copper-retirement notices
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink/Lumen Network Disclosures
Find current copper-retirement notices, wire centers, CLLIs, issue dates, and effective dates
1 - Primary
Weekly
-
Lumen / CenturyLink / Qwest
CenturyLink Active Network Disclosure Archive
Research historical network disclosures
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink Wholesale Network Disclosures
Research older wholesale and FCC network-change notices
2 - Supporting
Monthly
-
Frontier
Frontier Copper Optimization / Copper Retirement Notices
Find centralized copper-retirement notices by market or state
1 - Primary
Weekly
-
Frontier
Monitor current copper and switch-retirement notices
1 - Primary
Weekly
-
Frontier
Research prior-year copper and switch-retirement notices
2 - Supporting
As needed
-
AT&T
AT&T Regulatory Documents / Tariffs
Find state-specific tariffs, service withdrawals, and wire-center records
1 - Primary
Weekly
-
AT&T
FCC ECFS Search for AT&T Filings
Verify AT&T network-change and copper-retirement filings
1 - Primary
Weekly
-
State Commissions
NARUC State Regulatory Commission Directory
Locate the applicable PUC, PSC, or BPU for state-level verification
1 - Primary
Monthly
-
Windstream / Kinetic
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Consolidated / Fidium
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Other / Smaller ILECs
NARUC State Regulatory Commission Directory
Find the appropriate state regulator for carriers without a centralized disclosure page
1 - Primary
Monthly
-
All Carriers
Direct Carrier / Wholesale Partner Notices
Capture circuit- or location-specific deadlines received directly from a carrier
1 - Primary
As received
Talk to BCN about POTS replacement
About: Metcalfe County, KY (0 wire centers). BCN will confirm whether your service addresses fall inside an affected wire center.
Call BCN: 1.888.866.7266