BCN Industry Tracker
BCN POTS & Copper Retirement Tracker
Carrier copper and POTS retirement by state, county and wire center: FCC filings, deadlines and the business systems affected. Select a state to drill in.
Data updated
Current, next update November 26, 2026
24
States with confirmed FCC filings
274K+
Customer locations covered by confirmed filings
49
States and territories with an active carrier footprint
188
Days to the next authorized shut-off (Jun 1, 2027)
United States Arkansas Sharp County
Skip the map and go to the county table
- FCC approved
- Filed
- Not named in any filing
Select a county for its wire centers and shut-off date. On a small screen the county table below is easier to use than the map.
Arkansas
Confirmed: FCC approved
Shut-off authorized 238 days ago
- Carrier
- AT&T
- Docket
- WC Dockets 25-228, 25-335, 25-346, 26-67, 26-98, 26-162, 26-192, 26-200, 26-210, 26-293
- Earliest shut-off
- On or after Apr 1, 2026
- Not yet placed in a county
- 2
- Status
- Part of AT&T's 21-state legacy ILEC territory. AT&T stopped accepting new copper POTS orders here Oct 15, 2025 and is rolling out wire-center-level Section 214 filings under the FCC's streamlined process; targeting retirement of the "large majority" of its copper outside California by end of 2029.
Counties named in filings: 50 of 75, 94 wire centers
Select a county on the map, or in the county table below, to see its wire centers. Grey counties are not named in any FCC discontinuance filing loaded here.
Not yet placed in a county (2)
Named in a filing, but no public place record puts them in one county yet. A person places them; until then they apply somewhere in this state.
- Jessieville-Desoto (JSVLARDE, WC 25-335)
- Macedonia (MCDNARMA, WC 25-228)
Filed, list not loaded yet: AT&T WC 26-210. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Filed, list not loaded yet: AT&T WC 26-293. The places it covers are listed only in the carrier's application, which has not been loaded here yet.
Arkansas County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Arkansas County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Ashley County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Hamburg FCC approved
- Portland FCC approved
- Huttig Wire-center boundary reaches this county FCC approved
Baxter County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Baxter County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Benton County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-98, 26-162, 26-192
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 6
- Bentonville Filed
- Gravette Filed
- Rogers Filed
- Rogers-East FCC approved
- Hindsville Wire-center boundary reaches this county FCC approved
- Springdale Wire-center boundary reaches this county Filed
Boone County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Boone County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Bradley County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Warren FCC approved
- Wilmar Wire-center boundary reaches this county FCC approved
Calhoun County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
No wire center, exchange or city named in a filing is in Calhoun County itself. The Census blocks in the application, or the state's telephone exchange map, show the places below reaching into it, so some addresses here may be served by them.
Places named: 1
- Calion Wire-center boundary reaches this county FCC approved
Carroll County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Eureka Springs FCC approved
Chicot County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-200
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Dermott FCC approved
- Eudora FCC approved
- Lake Village FCC approved
- Portland Wire-center boundary reaches this county FCC approved
Clark County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Arkadelphia Main FCC approved
- Gurdon FCC approved
Clay County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Clay County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Cleburne County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Concord FCC approved
- Greers Ferry FCC approved
- Heber Springs FCC approved
Cleveland County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
No wire center, exchange or city named in a filing is in Cleveland County itself. The Census blocks in the application, or the state's telephone exchange map, show the places below reaching into it, so some addresses here may be served by them.
Places named: 1
- Warren Wire-center boundary reaches this county FCC approved
Columbia County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 6
- Magnolia FCC approved
- Mcneil FCC approved
- Village FCC approved
- Mount Holly Wire-center boundary reaches this county FCC approved
- Stamps Wire-center boundary reaches this county FCC approved
- Stephens Wire-center boundary reaches this county FCC approved
Conway County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Center Ridge FCC approved
- Cleveland FCC approved
- Morrilton-Fleetwood FCC approved
- Morrilton-Petit Jean FCC approved
Craighead County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-346, 26-67, 26-192
- Earliest shut-off
- On or after Apr 1, 2026
- Carrier
- AT&T
Places named: 4
- Cash FCC approved
- Jonesboro Filed
- Paragould Wire-center boundary reaches this county FCC approved
- Paragould-North Wire-center boundary reaches this county FCC approved
Crawford County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 26-192
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Natural Dam FCC approved
- Fort Smith Wire-center boundary reaches this county Filed
Crittenden County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 5
- Crawfordsville FCC approved
- Earle FCC approved
- Marion FCC approved
- Turrell FCC approved
- Hughes Wire-center boundary reaches this county FCC approved
Cross County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Cherry Valley FCC approved
- Hickory Ridge FCC approved
- Parkin FCC approved
- Wynne FCC approved
Dallas County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Dallas County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Desha County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 26-200
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Mcgehee FCC approved
- Watson FCC approved
- Dermott Wire-center boundary reaches this county FCC approved
Drew County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-335, 26-200
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Wilmar FCC approved
- Dermott Wire-center boundary reaches this county FCC approved
- Mcgehee Wire-center boundary reaches this county FCC approved
Faulkner County
Filed
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 26-192
- Earliest shut-off
- On or after Oct 16, 2026
- Carrier
- AT&T
Places named: 1
- Conway Filed
Franklin County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Franklin County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Fulton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Fulton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Garland County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-346, 26-192
- Earliest shut-off
- On or after Apr 1, 2026
- Carrier
- AT&T
Places named: 5
- Crystal Springs FCC approved
- Hot Springs FCC approved
- Hot Springs Rockwell Filed
- Lonsdale FCC approved
- Jones Mill Wire-center boundary reaches this county FCC approved
Grant County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
No wire center, exchange or city named in a filing is in Grant County itself. The Census blocks in the application, or the state's telephone exchange map, show the places below reaching into it, so some addresses here may be served by them.
Places named: 1
- Malvern Wire-center boundary reaches this county FCC approved
Greene County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 25-346, 26-67, 26-192
- Earliest shut-off
- On or after Apr 1, 2026
- Carrier
- AT&T
Places named: 5
- Paragould FCC approved
- Paragould-Light FCC approved
- Paragould-North FCC approved
- Jonesboro Wire-center boundary reaches this county Filed
- Walnut Ridge Wire-center boundary reaches this county FCC approved
Hempstead County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 2
- Hope FCC approved
- Nashville Wire-center boundary reaches this county FCC approved
Hot Spring County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335, 25-346
- Earliest shut-off
- On or after Apr 1, 2026
- Carrier
- AT&T
Places named: 3
- Jones Mill FCC approved
- Malvern FCC approved
- Hot Springs Wire-center boundary reaches this county FCC approved
Howard County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Nashville FCC approved
Independence County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Newark FCC approved
- Concord Wire-center boundary reaches this county FCC approved
- Newport Wire-center boundary reaches this county FCC approved
Izard County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Izard County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Jackson County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Grubbs FCC approved
- Newport FCC approved
- Hickory Ridge Wire-center boundary reaches this county FCC approved
Jefferson County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Altheimer FCC approved
- Grady Wire-center boundary reaches this county FCC approved
Johnson County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Johnson County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lafayette County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Stamps FCC approved
Lawrence County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Black Rock FCC approved
- Walnut Ridge FCC approved
- Cash Wire-center boundary reaches this county FCC approved
Lee County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 4
- Marianna FCC approved
- Moro FCC approved
- Forrest City-Main Wire-center boundary reaches this county FCC approved
- Hughes Wire-center boundary reaches this county FCC approved
Lincoln County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Grady FCC approved
Little River County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Ashdown Main FCC approved
Logan County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Logan County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Lonoke County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Lonoke FCC approved
Madison County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 1
- Hindsville FCC approved
Marion County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Marion County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Miller County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Miller County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Mississippi County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 6
- Blytheville Afb FCC approved
- Dell FCC approved
- Joiner FCC approved
- Luxora FCC approved
- Osceola FCC approved
- Wilson FCC approved
Monroe County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Brinkley FCC approved
Montgomery County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Montgomery County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Nevada County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Bodcaw FCC approved
- Stamps Wire-center boundary reaches this county FCC approved
- Stephens Wire-center boundary reaches this county FCC approved
Newton County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Newton County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Ouachita County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 5
- Camden-Cullendale FCC approved
- Camden-Shumaker FCC approved
- Camden-Temple FCC approved
- Stephens FCC approved
- Smackover Wire-center boundary reaches this county FCC approved
Perry County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Perry County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Phillips County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 3
- Helena-Hickory FCC approved
- Helena-West FCC approved
- Marianna Wire-center boundary reaches this county FCC approved
Pike County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
No wire center, exchange or city named in a filing is in Pike County itself. The Census blocks in the application, or the state's telephone exchange map, show the places below reaching into it, so some addresses here may be served by them.
Places named: 1
- Nashville Wire-center boundary reaches this county FCC approved
Poinsett County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Harrisburg FCC approved
- Cherry Valley Wire-center boundary reaches this county FCC approved
- Grubbs Wire-center boundary reaches this county FCC approved
Polk County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Polk County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Pope County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Pope County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Prairie County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Prairie County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Pulaski County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 26-192
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Little Rock Filed
- Little Rock Filed
- Little Rock-Wrights FCC approved
Randolph County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Randolph County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Saline County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 3
- Bauxite FCC approved
- Paron FCC approved
- Lonsdale Wire-center boundary reaches this county FCC approved
Scott County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Scott County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Searcy County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Searcy County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Sebastian County
Filed
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 26-192
- Earliest shut-off
- On or after Oct 16, 2026
- Carrier
- AT&T
Places named: 1
- Fort Smith Filed
Sevier County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Sevier County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Sharp County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Sharp County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
St. Francis County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Forrest City-Main FCC approved
- Hughes FCC approved
Stone County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-228
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
No wire center, exchange or city named in a filing is in Stone County itself. The Census blocks in the application, or the state's telephone exchange map, show the places below reaching into it, so some addresses here may be served by them.
Places named: 1
- Concord Wire-center boundary reaches this county FCC approved
Union County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 25-335
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 7
- Calion FCC approved
- Huttig FCC approved
- Mount Holly FCC approved
- Norphlet FCC approved
- Smackover FCC approved
- Strong FCC approved
- Urbana FCC approved
Van Buren County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Van Buren County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Washington County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Dockets 25-228, 26-162, 26-192
- Earliest shut-off
- On or after Jun 30, 2026
- Carrier
- AT&T
Places named: 2
- Springdale Filed
- Hindsville Wire-center boundary reaches this county FCC approved
White County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
Places named: 1
- Beebe FCC approved
Woodruff County
FCC approved
Shut-off authorized 238 days ago
- Filing / docket
- WC Docket 25-335
- Earliest shut-off
- On or after Nov 15, 2026
- Carrier
- AT&T
No wire center, exchange or city named in a filing is in Woodruff County itself. The Census blocks in the application, or the state's telephone exchange map, show the places below reaching into it, so some addresses here may be served by them.
Places named: 1
- Hickory Ridge Wire-center boundary reaches this county FCC approved
Yell County
Not named in any filing
No FCC discontinuance filing loaded here names a wire center in Yell County. It sits inside the AT&T footprint (Confirmed: FCC approved), so see the state summary for program-level status. Not named does not mean not at risk: filings arrive wire center by wire center.
Life-safety lines on copper here
Fire alarm panels, elevator phones and alarm transmitters must keep a compliant path after copper is discontinued. BCN POTS Over LTE is permitted under NFPA 72, UL Listed, approved for fire/life-safety incl. elevators & alarm panels, HIPAA, PCI and FCC compliant.
Status by county
50 counties in Arkansas have at least one wire center named in a filing. Select a county to see its wire centers.
| County | Status | Places named | Earliest shut-off | Docket |
|---|---|---|---|---|
| Ashley | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Benton | FCC approved | 6 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-98, 26-162, 26-192 |
| Bradley | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Calhoun Wire-center boundary reaches this county | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Carroll | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Chicot | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-200 |
| Clark | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Cleburne | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Cleveland Wire-center boundary reaches this county | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Columbia | FCC approved | 6 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Conway | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Craighead | FCC approved | 4 | On or after Apr 1, 2026 | WC Dockets 25-228, 25-346, 26-67, 26-192 |
| Crawford | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 26-192 |
| Crittenden | FCC approved | 5 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Cross | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Desha | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335, 26-200 |
| Drew | FCC approved | 3 | On or after Nov 15, 2026 | WC Dockets 25-335, 26-200 |
| Faulkner | Filed | 1 | On or after Oct 16, 2026 | WC Docket 26-192 |
| Garland | FCC approved | 5 | On or after Apr 1, 2026 | WC Dockets 25-228, 25-346, 26-192 |
| Grant Wire-center boundary reaches this county | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Greene | FCC approved | 5 | On or after Apr 1, 2026 | WC Dockets 25-228, 25-335, 25-346, 26-67, 26-192 |
| Hempstead | FCC approved | 2 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Hot Spring | FCC approved | 3 | On or after Apr 1, 2026 | WC Dockets 25-228, 25-335, 25-346 |
| Howard | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Independence | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Jackson | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Jefferson | FCC approved | 2 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Lafayette | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Lawrence | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Lee | FCC approved | 4 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Lincoln | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Little River | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Lonoke | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Madison | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Mississippi | FCC approved | 6 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Monroe | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Nevada | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Ouachita | FCC approved | 5 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Phillips | FCC approved | 3 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Pike Wire-center boundary reaches this county | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Poinsett | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Pulaski | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 26-192 |
| Saline | FCC approved | 3 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Sebastian | Filed | 1 | On or after Oct 16, 2026 | WC Docket 26-192 |
| St. Francis | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Stone Wire-center boundary reaches this county | FCC approved | 1 | On or after Jun 30, 2026 | WC Docket 25-228 |
| Union | FCC approved | 7 | On or after Jun 30, 2026 | WC Dockets 25-228, 25-335 |
| Washington | FCC approved | 2 | On or after Jun 30, 2026 | WC Dockets 25-228, 26-162, 26-192 |
| White | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
| Woodruff Wire-center boundary reaches this county | FCC approved | 1 | On or after Nov 15, 2026 | WC Docket 25-335 |
Not named in any filing loaded here: Arkansas, Baxter, Boone, Clay, Dallas, Franklin, Fulton, Izard, Johnson, Logan, Marion, Miller, Montgomery, Newton, Perry, Polk, Pope, Prairie, Randolph, Scott, Searcy, Sevier, Sharp, Van Buren, Yell.
Key national deadlines
-
Done
FCC cuts the required copper-retirement customer notice period from 180 days to 90 days.
-
Done
Lumen stops accepting new & move/add/change POTS orders across its 14-state legacy CenturyLink/Qwest territory.
-
Done
AT&T stops accepting new copper POTS orders across ~20 states in its ILEC footprint.
-
Done
AT&T files FCC discontinuance application covering ~90,000 customers across 18 states.
-
Done
FCC grants AT&T's 18-state application, over 30% of its copper footprint outside California.
-
Done
FCC adopts the Network and Services Modernization Order (FCC-26-19A1), streamlining Section 214 nationwide.
-
Done
AT&T begins physically decommissioning ~500 wire centers (~10% of its footprint).
-
Done
FCC approves AT&T's California discontinuance application covering 184,000+ locations.
-
Done
Deadline: permanent copper discontinuance for ~90,000 AT&T customers across 18 states.
-
Upcoming
Earliest date AT&T can begin discontinuing California copper service (184,000 locations).
-
Upcoming
AT&T's target to retire the large majority of its copper footprint outside California.
If your lines are in a named wire center
Move fire alarm, elevator and voice lines off copper before the carrier does it for you.
BCN POTS Over LTE keeps legacy panels working over a managed LTE connection with battery backup, on a single invoice for every location. BCN also offers Cloud Voice (UCaaS), SIP/SIP PRI and Cable Voice where a full voice migration makes more sense.
BCN POTS Over LTE
- Fully monitored and managed
- MFVN-compliant ATA, up to 8 lines per device
- Dual-SIM 4G LTE with optional wired redundancy
- 8-hour battery backup (24-hour optional)
- Supports fax (T.38), modem, alarm transmitters, elevator phones
- White-glove installation with post-install test report
- Permitted under NFPA 72
- UL Listed
- Approved for fire/life-safety incl. elevators & alarm panels
- HIPAA, PCI and FCC compliant
Source: BCN POTS Over LTE Solution Overview; BCN POTS Replacement Solutions Overview
Latest coverage from carriers and the FCC
-
Data Center Dynamics
Nvidia looks to tap Brightspeed central offices for inference network - report
-
Data Center Dynamics
AT&T copper retirement pushes on as carrier reveals just 1% still using legacy technology
-
Light Reading
AT&T copper network retirement set to accelerate as legacy base shrinks to 1%
-
Broadband Breakfast
-
DataRemote
-
Fusion Connect
FCC Unanimously Clears a Faster Path to Retire Copper Networks
-
Broadband Breakfast
-
FCC
Network and Services Modernization Order (FCC 26-19), full text
-
Broadband Breakfast
AT&T Approved to Discontinue Service at More Than 30% of Copper Footprint This Year
-
Light Reading
-
Fierce Network
Authoritative sources
Use these sources to discover and verify retirement records. A published deadline should be tied to the underlying carrier/FCC/state notice, not this source list alone.
-
FCC
FCC Electronic Comment Filing System (ECFS)
Search carrier filings and proceedings involving copper retirement and network changes
1 - Primary
Weekly
-
FCC
FCC Wireline Competition Bureau
Monitor wireline public notices, orders, and policy updates
1 - Primary
Weekly
-
FCC
Confirm governing network-change and copper-retirement notification rules, especially §51.333
1 - Primary
Quarterly
-
Verizon
Verizon Network Disclosures 2025-2026
Find current copper-retirement disclosures by state and notice
1 - Primary
Weekly
-
Verizon
Verizon Partner Solutions Network Events
Monitor copper retirements, switch retirements, and other network events
1 - Primary
Weekly
-
Verizon
Verizon Network Disclosures 2022-2024 Archive
Research historical copper-retirement notices
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink/Lumen Network Disclosures
Find current copper-retirement notices, wire centers, CLLIs, issue dates, and effective dates
1 - Primary
Weekly
-
Lumen / CenturyLink / Qwest
CenturyLink Active Network Disclosure Archive
Research historical network disclosures
2 - Supporting
As needed
-
Lumen / CenturyLink / Qwest
CenturyLink Wholesale Network Disclosures
Research older wholesale and FCC network-change notices
2 - Supporting
Monthly
-
Frontier
Frontier Copper Optimization / Copper Retirement Notices
Find centralized copper-retirement notices by market or state
1 - Primary
Weekly
-
Frontier
Monitor current copper and switch-retirement notices
1 - Primary
Weekly
-
Frontier
Research prior-year copper and switch-retirement notices
2 - Supporting
As needed
-
AT&T
AT&T Regulatory Documents / Tariffs
Find state-specific tariffs, service withdrawals, and wire-center records
1 - Primary
Weekly
-
AT&T
FCC ECFS Search for AT&T Filings
Verify AT&T network-change and copper-retirement filings
1 - Primary
Weekly
-
State Commissions
NARUC State Regulatory Commission Directory
Locate the applicable PUC, PSC, or BPU for state-level verification
1 - Primary
Monthly
-
Windstream / Kinetic
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Consolidated / Fidium
Locate official network-change filings when no centralized carrier page is available
1 - Primary
Weekly
-
Other / Smaller ILECs
NARUC State Regulatory Commission Directory
Find the appropriate state regulator for carriers without a centralized disclosure page
1 - Primary
Monthly
-
All Carriers
Direct Carrier / Wholesale Partner Notices
Capture circuit- or location-specific deadlines received directly from a carrier
1 - Primary
As received
Talk to BCN about POTS replacement
About: Sharp County, AR (0 wire centers). BCN will confirm whether your service addresses fall inside an affected wire center.
Call BCN: 1.888.866.7266